| Paths Greenways Bridleways Tracks | ||
| PG: OBJECTS: PROMOTION: Abbots Langley 80 BW Woodside Road Development BW | ||
![]() Annotated map reproduced courtesy of Googlemaps. |
This route runs from the Woodside Road development to High Elms Lane.
A volunteer has photographed this route for the 2025 Access and Riding Rights of Way Survey, and the photographs will be uploaded shortly. Find out more! At the time of the 2025 Access Survey (28 Sep 25), the way was unobstructed and it was signposted at each end. |
| Legal History 12 Aug 2016: The Woodside Road Development Public Path Creation Agreement 2016 created this bridleway. HCC reference: 3R/26. 28 Jun 2018: Landowner deposit under s.31(6) Highways Act 1980 stated route is a bridleway. |
DRAFT Definitive Statement (12 Aug 2016)
Path: [Abbots Langley] 80 (TBC). Recorded Status: Bridleway. A public bridleway commencing at a junction with the adopted highway at TL 1070 0173 (point A on the plan) running generally north east for approximately 135 metres to TL 1077 0184 (point B on the plan). Then generally east south east for approximately 30 metres to TL 1080 0183 (point C on the plan). Then generally north north east for approximately 95 metres to TL 1084 0191 (point D on the plan). Then generally south east approximately 25 metres to TL 1086 0190 (point E on the plan). Then generally north east for approximately 55 metres to TL 1090 0193 (point F on the plan) to a junction with High Elms Lane (public road). Width: 4 metres. Limitations: None |
© 2023 Patchetts Green Bridleways Trust. File reference: EC975. HCC reference: 3R/26.